Sign In | Join Free | My chinacomputerparts.com |
|
Brand Name : Rongbao
Model Number : OEM
Certification : ISO9001:2015
Place of Origin : China
MOQ : 100pcs
Price : Negotiable
Payment Terms : L/C, T/T
Supply Ability : 10,000 tons per year
Delivery Time : 30 days
Packaging Details : EPE foam + Bubble wrap + Carton + Wooden box
Material : Stainless Steel
Casting Process : Investment Casting
Specification : Non Standard
Dimension : Based on Drawing
Surface treatment : As clients requirement
Features : High precision, High effiency
Stainless Steel Casting / Precision Investment Casting Process for Industry Product
Product Description
Material | Stainless Steel |
Process | Investment Casting |
Dimension | Based on drawing |
Advantages |
High degree of dimensional accuracy Minimal post-processing required |
Payment Terms |
L/C, T/T |
Packaging Details | as per buyer requirement |
Delivery Time | 30 days |
Foundry Overview
1.Good quality with direct factory price;
3. OEM / ODM Service;
4.Customized size and specification as per your drawing or sample;
5. Quotation will be offered within 72 hours;
6. Flexible lead time& efficient shipment;
7. Advanced Production & Measurement equipment
Request A Quote
To receive accurate cost and time estimates for your custom casting project, please provide the following information of the parts you are requesting,
• Drawings(.dwg/.pdf) and specifications:
including but not limited to material, dimensional tolerance, machining requirements, actual or estimated weight and inspection requirements.
• Material: a specific metal grade or the preferred material and desired properties.
• Quantity: Include the anticipated volume, both present and future. Quantity has a large influence over production method, pattern development, and overall cost.
• Quality acceptance criteria, such as nondestructive test, mechanical testing are all critical considerations for a quote.
What is non-destructive testing?
Nondestructive testing (NDT) is used to test and evaluate a product’s structural integrity without damaging the part. NDT is used to ensure product reliability, control manufacturing processes, and maintain a consistent level of quality.
FAQ
What is the typical timeframe for making a part?
Generally, four to six weeks is necessary for tooling and sample casting, and four to ten weeks is required for production. The timeframe for any project will depend on the size, weight, complexity, and quantity of the parts that need to be produced.
![]() |
Stainless Steel Casting Precision Investment Casting Process For Industry Product Images |